Update on County Trail Projects

27710170_1936277946400692_96312095302400857_o
Me Pointing at Potential New Multiuse Trail Connecting 2nd Street and Karst Farm Greenway

Last week I gave a presentation to the Bloomington Bicycle Club at their annual meeting, giving an update on a number of County (and one City thrown in there) infrastructure projects with a bike/pedestrian component. This is only a sample — there are more. Since several people asked for copies of that presentation I thought I’d make it available here: BBC Presentation 2018-02-10.

Please note that all of the maps are ones that I made for illustrative purposes. None are official, and project plans may change for any variety of reasons.

Among other projects, I talked about the the Limestone Greenway/Illinois Central corridor south of the Bloomington Rail Trail, the Monon Corridor connecting the Karst Farm Greenway with Ellettsville, and several westside road projects that will have multiuse paths and sidewalk facilities accompanying them. I also discussed a potential project that is still in the conceptual stages that would connect the multiuse path on the north side of Second Street/Bloomfield Road with the Karst Farm Greenway, via Liberty Drive. Here is the map I drew of that potential project:

Screenshot 2018-02-15 16.04.42

Also gave an update on the Vernal Pike Greenway project, that will connect Will Detmer Park (where the existing multiuse path along Vernal Pike ends) to the Karst Farm Greenway. This path will provide multiuse facilities along one of two remaining breaks between the City’s B-Line Trail and the County’s Karst Farm Greenway. This project, after long delays, will finally go into construction this year (2018), and will feature an historic truss bridge over the Indiana Railroad tracks just west of Curry Pike, very similar to this bridge (the actual bridge to be used is in pieces in a warehouse at the moment):

Screenshot 2018-02-16 08.39.10
Historic Truss Bridge to be Used on Vernal Pike Greenway

Finally talked about a City of Bloomington trail project that will run south of Winslow, parallel to and just to the east of the Bloomington Rail Trail.

Screenshot 2018-02-16 08.44.53
City of Bloomington’s Planned Southern B-Line Extension

The idea is to maintain the existing Bloomington Rail Trail’s soft surface, which is beloved by walkers and runners, and create a paved trail in the old CSX railroad corridor parallel to and just to the east of the Rail Trail. This corridor was given to the City by Monroe County in a land swap for the Illinois Central corridor south of Church Lane that the County is currently developing as a trail. The paved surface will be much more usable by cyclists, strollers, wheelchairs, etc. I’ve been told by City Parks and Recreation Officials that this project is slated for 2020, although the corridor has already been cleared by City of Bloomington Utilities for a sewer interceptor project.

Here is a link to a drone flight I took over the corridor.

It was a great opportunity to update the cycling community on many exciting Monroe County projects — and I was also accompanied in the presentation with the City of Bloomington Bicycle Coordinator Beth Rosenbarger, who gave us an update on numerous bike/ped developments and initiatives in the City of Bloomington.

Advertisements

One thought on “Update on County Trail Projects

  1. Geoff,
    I don’t want to “overdo” it, but you do some very impressive work. This is a really “neat” and encouraging vision and much of it reality already.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s